CELESC – Florianópolis

Installation Date: December, 2003

Description:

  • Photovoltaic system connected to the public power grid
  • Installed power: 1,408Wp
  • 11 flexible amorphous silicon modules with 128Wp each

 

Location: Florianópolis, SC