Category Archives: Projects

Petrobrás

Installation Date: October, 2004   Description:   Oil pumping system assisted by solar photovoltaic energy. Installed power: 768Wp 12 amorphous silicon modules with 64Wp each   Location: Mossoro, RN

Read More

CELESC – Lages

Installation Date: January, 2004 Description: Photovoltaic system connected to the public power grid Installed power: 1,408Wp 11 flexible amorphous silicon modules with 128Wp each Location: Lages, SC

Read More

CELESC – Tubarão

Installation Date: January, 2004   Description: Photovoltaic system connected to the public power grid Installed power: 1,408Wp 11 flexible amorphous silicon modules with 128Wp each   Location: Tubarão, SC

Read More

Mineirão Stadium

Date: May, 2010 Description: Still being installated Evaluated Technologies: Amorphous silicon (a-Si), crystalline silicon (c-Si), cadmium telluride (CdTe) Basic design and economic analysis   Location: Belo Horizonte, MG

Read More